Underground pipes (30mm) were put in before any granite was laid and at places where signals are expected to be we terminated these into 4" drainage pipe which we stood vertically, this will be to take the wire terminations for signals and telephones. These all go back to our signal box, which we have still to build the concrete base for this is guarded currently by Bill & Ben |